Q
Quantus Consulting
STRATEGIC. RELIABLE. PROVEN.
Service · BOQ preparation

MEP BOQ preparation for UAE, KSA and GCC projects.

Tender-ready bills of quantities for mechanical, electrical, public health, fire and ELV services, measured in CostX to NRM2 or POMI, with every quantity traceable back to the drawings.

NRM2POMICESMM4CostXL1 + L2 QA
01 · Overview

Bills of quantities your tenderers can price with confidence.

MEP packages typically make up 25–35% of the total budget on Middle East projects, and they are where vague quantities cause the most expensive surprises. A well-measured MEP BOQ gives every tenderer the same clear scope, makes bids directly comparable and leaves far less room for claims later.

Quantus prepares MEP bills of quantities for cost consultants, main contractors, MEP subcontractors and developers across the UAE, Saudi Arabia and the wider GCC. Each BOQ is measured in CostX from your drawings or BIM model, written to the standard you specify and checked at two levels before it is issued.

02 · Scope

What the MEP BOQ covers

Mechanical — HVAC

Ductwork, chilled-water and refrigerant pipework, air-handling units, fan coil units, insulation, dampers, grilles and diffusers.

Electrical — LV & lighting

LV distribution, switchgear and panels, containment, cabling, lighting, small power and earthing.

Public health

Domestic water supply, drainage, sanitary installations, pumps and tanks.

Fire protection

Sprinklers, fire alarm, hose reels, suppression systems and associated pipework.

ELV & BMS

Data and communications, security, access control, CCTV and building management controls.

Preambles & qualifications

Item descriptions to the chosen standard, plus a schedule of assumptions, exclusions and MEP qualifications.

03 · Approach

How each BOQ is delivered

01

Measured in CostX

2D take-off from PDF and DWG drawings, or model-based quantities from BIM, with the CostX file issued alongside the workbook.

02

Your standard, your format

NRM2, POMI or CESMM4 for civils, or your own BOQ template and coding.

03

7–14 days for BIM BOQs

Model-based MEP BOQs issued with QA sign-off in 7–14 days, depending on size and model quality.

04

Working while you sleep

New Zealand is 8–9 hours ahead of the Gulf. Send drawings at close of business in Dubai and work is under way overnight.

04 · FAQ

Common questions.

Can't see your question? Email projects@quantusqs.com or message us on WhatsApp.

What do you need to start an MEP BOQ?

The MEP drawings (PDF or DWG) or the BIM model, the specifications, and the measurement standard or BOQ format you want. If the design is incomplete, assumptions are listed clearly in the BOQ.

Which measurement standards do you work to?

NRM2 and POMI for building services, CESMM3 or CESMM4 for civils and infrastructure, or your own house format.

Can you price the BOQ as well?

Yes. Tender BOQs can be priced from market rates and supplier quotes, or left unpriced for tendering.

How is the fee calculated?

Each package is quoted as a fixed fee in USD or NZD based on the project size and scope. Fee proposals are usually issued within five working days.

How do you work with Gulf project teams from New Zealand?

Drawings and queries are exchanged by email and WhatsApp. The time difference means work progresses overnight, so updates are often waiting in your inbox the next morning.

Let's price your project properly.

Fixed-fee proposals in USD or NZD, usually within five working days.

© 2026 Quantus Consulting Napier, New Zealand · Serving the GCC
Chat on WhatsApp