01
Plan & advise
MEP Cost Management
HVAC, electrical, public health and fire protection estimates from concept to tender.
02
Plan & advise
Infrastructure Cost Management
Cost plans and BOQs for roads, utilities and networks to CESMM3 and CESMM4.
03
Plan & advise
Cost Planning & Estimating
NRM1 elemental cost plans, tracked and reconciled through each design stage.
04
Plan & advise
Option Appraisal & Lifecycle
Alternative systems compared on capital and whole-life cost.
05
Measure & document
2D & 3D Quantification
Take-off from drawings and BIM models in CostX.
06
Measure & document
BOQ Preparation
Bills to NRM2, CESMM4 or POMI — for MEP and civils.
07
Measure & document
Express BIM Measurement
Model-based BOQs delivered in 7–14 days with QA sign-off.
08
Price & control
MEP & Infrastructure Pricing
Tender BOQs priced from market rates and supplier quotes.
09
Price & control
Tender Analysis Support
Bids checked, normalised and compared like-for-like.
10
Price & control
Variation Support
Change measured and valued from tender through to IFC.
Express BIM measurement
7–14 days
From model to issued, QA-signed BOQ — with the CostX file included.
1
Validate
Model QA/QC with 2D drawings
The 3D model is cross-checked against 2D drawings before quantification.
2
CostX
Model mapping & take-off
Bulk quantities extracted through model mapping or schedule extraction.
3
Complete
2D measurement to complete
Items not modelled — cabling, for example — measured from drawings.
4
Draft
BOQ / cost plan production
Drafted in a CostX workbook to the agreed standard.
5
Issue
QA/QC sign-off
Level 1 and Level 2 sign-off, issued with the CostX file.
Service guides
Find out more about each service.
BOQ preparationMEP BOQ preparation for UAE, KSA and GCC projectsMEP bills of quantities for HVAC, electrical, plumbing, fire and ELV services, measured in CostX to NRM2 or POMI.Read more →Cost estimationMEP cost estimation and cost planning, from concept to tenderMEP cost estimates and NRM1 elemental cost plans from concept to tender for UAE, KSA and GCC projects.Read more →CostX take-offCostX take-off from drawings and BIM modelsCostX 2D and 3D take-off services from drawings and BIM models for MEP and infrastructure.Read more →Outsourced QSOutsourced MEP quantity surveying, as an extension of your teamOutsourced MEP quantity surveying for Gulf cost consultants, main contractors and MEP subcontractors.Read more →
Not sure which you need?
Send us the project and stage — we'll tell you exactly where we add value, and what it costs.